Protection & Controls · Electrical Testing · Commissioning

Relay protection, electrical testing & commissioning.

Protective relay testing, electrical maintenance testing, and commissioning for utilities, electrical contractors, and industrial facilities — performed to ANSI, NETA, IEEE, and IEC standards.

  • Protective Relay Testing

  • Secondary Injection

  • IEC 61850 · GOOSE Validation

  • Switchgear & Transformers

  • Medium-Voltage Cable

  • VFD & Motor Systems

Performed to

ANSI · NETA · IEEE · IEC

Orlando, Florida

Field dispatch on request

NewEra Testing field services

We Test What Protects

We prove that relays, switchgear, transformers, and drives perform as intended — at commissioning, during maintenance, and after a failure.

Our Orlando-based field teams serve electrical contractors, utilities, and industrial facilities across the region, with hands-on expertise, fast response, and detailed technical documentation on every job.

01 · Protection & Controls

Relay programming, secondary injection, and IEC 61850 validation.

50/51
87 · 21

Overcurrent · Differential · Distance

Relay testing equipment and laptop in a switchgear lineup
NewEra Testing LLC
NewEra Testing LLC
Medium-voltage switchgear with multifunction protective relays

ATS · MTS

Acceptance and maintenance testing to ANSI/NETA specifications.

Icon

Switchgear & circuit breakers

Icon

Power & instrument transformers

Icon

Medium-voltage cable

Icon

VFD & motor systems

Core Services

Testing, commissioning, and maintenance across your power system.

From protective relays and switchgear to transformers, medium-voltage cable, and drives — we test, commission, and troubleshoot the equipment that keeps your facility energized and protected.

01

Protective Relay Testing & Commissioning

Protective relay testing and commissioning
Protective relay testing and commissioning

Field testing and commissioning of protective relays: settings applied and verified, protection functions proven by secondary injection, and trip paths confirmed end to end.

02

Protection & Control Systems

Protection & Control Systems – NewEra Testing
Protection & Control Systems – NewEra Testing

Field commissioning, inspection, and troubleshooting of complete protection and control systems: relay logic, IEC 61850 communications, time synchronization, and the schemes that tie them together.

03

Secondary Injection Testing

Relay testing equipment and laptop in a switchgear lineup
Secondary injection testing

Three-phase secondary injection testing of protective relays. Pickup, timing, and logic verified across overcurrent, differential, and distance elements, documented to ANSI/NETA test specifications.

04

Electrical Maintenance Testing

Electrical maintenance testing
Electrical maintenance testing

Scheduled field testing of switchgear, breakers, transformers, cable, and relays that trends equipment condition, helps prevent unplanned outages, and supports NFPA 70B and ANSI/NETA MTS programs.

05

Switchgear & Circuit Breaker Testing

Switchgear & Circuit Breaker Testing – NewEra Testing
Switchgear and circuit breaker testing

Acceptance and maintenance testing of low- and medium-voltage switchgear and circuit breakers. Insulation, contact resistance, timing, and trip verification performed to ANSI/NETA specifications.

06

Transformer Testing & Maintenance

Transformer Testing & Maintenance – NewEra Testing
Dry-type transformer during field inspection

Field testing and maintenance of liquid-filled and dry-type transformers. Insulation, turns ratio, winding resistance, power factor, and oil sampling, performed and documented to ANSI/NETA and IEEE practices.

07

Medium-Voltage Cable Testing

Medium-voltage cable testing
Medium-voltage cable testing

VLF withstand, tan delta, and partial discharge testing for medium-voltage cable. We confirm new installations and assess aged insulation before it fails in service.

08

Commissioning & Acceptance Testing

Commissioning & Acceptance Testing – NewEra Testing
Doble F6150SV relay test set

ANSI/NETA ATS acceptance testing and end-to-end commissioning of electrical power and protection systems, verifying equipment, wiring, settings, and trip paths before first energization.

09

Troubleshooting & Fault Analysis

Voltage harmonics analysis
Data logger analysis

Field troubleshooting and fault event analysis for protection, control, and power distribution systems. We isolate root causes, verify corrections, and document every finding.

010

VFD / Motor System Troubleshooting

VFD and motor system troubleshooting
VFD and motor system troubleshooting

Field troubleshooting, startup, and programming for ABB, Danfoss, Eaton, Allen-Bradley, Toshiba, and Siemens variable frequency drives and the motors they run. Faults isolated, corrected, and verified.

Protective Relay Testing & Commissioning

Protective relay testing and commissioning
Protective relay testing and commissioning

Field testing and commissioning of protective relays: settings applied and verified, protection functions proven by secondary injection, and trip paths confirmed end to end.

Protection & Control Systems

Protection & Control Systems – NewEra Testing
Protection & Control Systems – NewEra Testing

Field commissioning, inspection, and troubleshooting of complete protection and control systems: relay logic, IEC 61850 communications, time synchronization, and the schemes that tie them together.

Secondary Injection Testing

Relay testing equipment and laptop in a switchgear lineup
Secondary injection testing

Three-phase secondary injection testing of protective relays. Pickup, timing, and logic verified across overcurrent, differential, and distance elements, documented to ANSI/NETA test specifications.

Electrical Maintenance Testing

Electrical maintenance testing
Electrical maintenance testing

Scheduled field testing of switchgear, breakers, transformers, cable, and relays that trends equipment condition, helps prevent unplanned outages, and supports NFPA 70B and ANSI/NETA MTS programs.

Switchgear & Circuit Breaker Testing

Switchgear & Circuit Breaker Testing – NewEra Testing
Switchgear and circuit breaker testing

Acceptance and maintenance testing of low- and medium-voltage switchgear and circuit breakers. Insulation, contact resistance, timing, and trip verification performed to ANSI/NETA specifications.

Transformer Testing & Maintenance

Transformer Testing & Maintenance – NewEra Testing
Dry-type transformer during field inspection

Field testing and maintenance of liquid-filled and dry-type transformers. Insulation, turns ratio, winding resistance, power factor, and oil sampling, performed and documented to ANSI/NETA and IEEE practices.

Medium-Voltage Cable Testing

Medium-voltage cable testing
Medium-voltage cable testing

VLF withstand, tan delta, and partial discharge testing for medium-voltage cable. We confirm new installations and assess aged insulation before it fails in service.

Commissioning & Acceptance Testing

Commissioning & Acceptance Testing – NewEra Testing
Doble F6150SV relay test set

ANSI/NETA ATS acceptance testing and end-to-end commissioning of electrical power and protection systems, verifying equipment, wiring, settings, and trip paths before first energization.

Troubleshooting & Fault Analysis

Voltage harmonics analysis
Data logger analysis

Field troubleshooting and fault event analysis for protection, control, and power distribution systems. We isolate root causes, verify corrections, and document every finding.

VFD / Motor System Troubleshooting

VFD and motor system troubleshooting
VFD and motor system troubleshooting

Field troubleshooting, startup, and programming for ABB, Danfoss, Eaton, Allen-Bradley, Toshiba, and Siemens variable frequency drives and the motors they run. Faults isolated, corrected, and verified.

01

Protective Relay Testing & Commissioning

Protective relay testing and commissioning
Protective relay testing and commissioning

Field testing and commissioning of protective relays: settings applied and verified, protection functions proven by secondary injection, and trip paths confirmed end to end.

02

Protection & Control Systems

Protection & Control Systems – NewEra Testing
Protection & Control Systems – NewEra Testing

Field commissioning, inspection, and troubleshooting of complete protection and control systems: relay logic, IEC 61850 communications, time synchronization, and the schemes that tie them together.

03

Secondary Injection Testing

Relay testing equipment and laptop in a switchgear lineup
Secondary injection testing

Three-phase secondary injection testing of protective relays. Pickup, timing, and logic verified across overcurrent, differential, and distance elements, documented to ANSI/NETA test specifications.

04

Electrical Maintenance Testing

Electrical maintenance testing
Electrical maintenance testing

Scheduled field testing of switchgear, breakers, transformers, cable, and relays that trends equipment condition, helps prevent unplanned outages, and supports NFPA 70B and ANSI/NETA MTS programs.

05

Switchgear & Circuit Breaker Testing

Switchgear & Circuit Breaker Testing – NewEra Testing
Switchgear and circuit breaker testing

Acceptance and maintenance testing of low- and medium-voltage switchgear and circuit breakers. Insulation, contact resistance, timing, and trip verification performed to ANSI/NETA specifications.

06

Transformer Testing & Maintenance

Transformer Testing & Maintenance – NewEra Testing
Dry-type transformer during field inspection

Field testing and maintenance of liquid-filled and dry-type transformers. Insulation, turns ratio, winding resistance, power factor, and oil sampling, performed and documented to ANSI/NETA and IEEE practices.

07

Medium-Voltage Cable Testing

Medium-voltage cable testing
Medium-voltage cable testing

VLF withstand, tan delta, and partial discharge testing for medium-voltage cable. We confirm new installations and assess aged insulation before it fails in service.

08

Commissioning & Acceptance Testing

Commissioning & Acceptance Testing – NewEra Testing
Doble F6150SV relay test set

ANSI/NETA ATS acceptance testing and end-to-end commissioning of electrical power and protection systems, verifying equipment, wiring, settings, and trip paths before first energization.

09

Troubleshooting & Fault Analysis

Voltage harmonics analysis
Data logger analysis

Field troubleshooting and fault event analysis for protection, control, and power distribution systems. We isolate root causes, verify corrections, and document every finding.

010

VFD / Motor System Troubleshooting

VFD and motor system troubleshooting
VFD and motor system troubleshooting

Field troubleshooting, startup, and programming for ABB, Danfoss, Eaton, Allen-Bradley, Toshiba, and Siemens variable frequency drives and the motors they run. Faults isolated, corrected, and verified.

Why NewEra

Protection and control services you can trust.

Focused protection & controls expertise, disciplined safety practice, and responsive field support — applied the same way on every job.

Focused protection & controls expertise, disciplined safety practice, and responsive field support — applied the same way on every job.

Relay test software running on a laptop inside a switchgear room

Relay settings verification

01

Standards-Driven, Fully Documented

Every job follows ANSI, NETA, IEEE, and IEC standards and closes with detailed technical documentation and verified relay performance.

02

Beyond Protection Function Verification

We validate IEC 61850 GOOSE messaging, time synchronization, and communication architecture — not just pickup and timing.

03

Safety Is Foundational

OSHA 10-trained field teams work to NFPA 70 and MSHA requirements, with arc flash awareness, proper PPE, and continuous safety training.

04

Fast, Hands-On Field Response

Routine commissioning or emergency field validation — a field service technician is dispatched on request, with fast turnaround on results.

Protection & Controls

Protecting power systems, one relay at a time.

Protection relay programming, logic verification, and comprehensive three-phase secondary injection testing across overcurrent, differential, and distance functions. Relay settings are applied and verified exactly as issued by the engineer of record or client.

Protective relay front panel during testing

Relay targets and event records

Protective relay front panel during testing

Relay targets and event records

Protection elements verified · IEEE C37.2 device numbers

50/51

Instantaneous / Time Overcurrent

21

Distance Protection

87T

Transformer Differential

87G

Generator Differential

40

Loss of Field

32

Directional (Reverse) Power

49

Motor Thermal Overload

46

Negative-Sequence Current Unbalance

Relay & Logic Programming

Settings and protection logic programmed exactly as issued by the engineer of record or client, then verified against the settings sheet before energization.

Secondary Injection Testing

Three-phase injection proves pickup, timing, slope, and reach for overcurrent, differential, and distance elements.

IEC 61850 & GOOSE Validation

GOOSE messaging integrity, protocol-level diagnostics, and communication architecture assessment for IEC 61850 substation networks.

Time Synchronization Validation

Time sources and relay clocks verified so event records align across the system — essential for accurate fault analysis.

Fault Event Analysis

Relay event records and oscillography reviewed to explain operations, isolate root cause, and confirm protection responded as set.

Asset Protection Verification

Transformer, generator, and motor protection schemes verified — from stator faults and loss of field to overloads and stalling.

Testing & Commissioning

Acceptance and maintenance tests, matched to the equipment.

Tests are selected for the equipment, its condition, and its role in the system, then performed to ANSI/NETA ATS or MTS.

01

Switchgear & Circuit Breakers

Insulation resistance testing

Contact resistance (micro-ohm)

Timing and travel analysis

Vacuum interrupter integrity testing

Primary current injection

Trip and close circuit checks

02

Power & Instrument Transformers

Turns ratio (TTR)

Winding resistance

Power factor / dissipation factor

Excitation current

Sweep frequency response analysis (SFRA)

CT/PT ratio, polarity, excitation

03

Medium-Voltage Cable

Insulation resistance testing

VLF withstand testing

Tan delta (dissipation factor)

Partial discharge diagnostics

Shield continuity testing

04

Motors & VFDs

Motor insulation resistance and PI

VFD startup and commissioning

Speed reference and ramp setup

Analog and digital I/O checks

Fault response logic verification

Legacy drive reconfiguration

Industries Served

Field support for the facilities that can’t go dark.

We serve electrical contractors, utilities, and industrial facilities across the region — wherever protection and uptime carry real consequences.

01

Electrical Contractors

Acceptance testing and commissioning support to close out projects to specification — relays programmed, equipment verified, documentation delivered.

02

Utilities & Substations

Substation relay commissioning, IEC 61850 GOOSE validation, and time synchronization checks for transmission and distribution protection schemes.

03

Industrial Plants & Manufacturing

Maintenance testing, motor protection, and VFD troubleshooting that keep production lines running and protected.

04

Power Generation

Generator protection verified for stator winding faults, loss of field, and reverse power, alongside transformer and switchgear testing.

05

Mining & Heavy Industry

MSHA-compliant field teams support protection, drive, and power distribution systems at mine and heavy industrial sites.

06

Water & Wastewater

Drive startup, programming, and troubleshooting on pump systems, plus motor protection testing for treatment plants and lift stations.

Switchgear and motor control lineup

Switchgear and motor control lineup · industrial facility

In the Field

Hands-on work, where the equipment lives.

From substation yards to switchgear rooms and drive lineups, our field teams test, commission, and troubleshoot on site.

Power transformer in an electrical substation

Substation power transformer diagnostics

Relay settings verification in switchgear

Relay settings verification in switchgear

Dry-type transformer during field testing

Dry-type transformer

Secondary injection through test switches

Secondary injection through test switches

Three-phase secondary injection test set

Three-phase secondary injection test set

VFD startup and field troubleshooting

VFD startup and field troubleshooting

Standards & Methodology

Standards-driven testing. Every test. Every time.

Every job is performed in accordance with ANSI, NETA, IEEE, and IEC standards, following a defined sequence from scope review to documented results.

How every job runs

01

Scope & Review

We review drawings, one-lines, and the settings issued by the engineer of record or client before mobilizing.

02

Safe Mobilization

Job briefing, hazard awareness, arc flash precautions, and proper PPE are in place before any test begins.

03

Test & Verify

Relay settings are applied and verified; equipment is tested against ANSI/NETA and manufacturer acceptance criteria.

04

System Validation

Trip circuits, IEC 61850 GOOSE messaging, and time synchronization are validated as one working system.

05

Document & Deliver

Detailed technical documentation records results, as-left settings, and deficiencies — ready for your records and the next test cycle.

Standards we work to

Each test plan is built on the applicable ANSI/NETA specification, IEEE and IEC standards, and the manufacturer’s published criteria.

ANSI/NETA ATS

Acceptance Testing Specifications for Electrical Power Equipment and Systems

ANSI/NETA MTS

Maintenance Testing Specifications for Electrical Power Equipment and Systems

IEEE C37.2

Electrical Power System Device Function Numbers

IEC 61850

Communication Networks and Systems for Power Utility Automation

IEEE C57.152

Diagnostic Field Testing of Fluid-Filled Power Transformers

IEEE 400.2

VLF Field Testing of Shielded Power Cable Systems

IEEE 43

Insulation Resistance Testing of Rotating Machinery

NFPA 70E

Standard for Electrical Safety in the Workplace

Request a Quote

Schedule testing, commissioning, or emergency field support.

Share your scope and schedule — a field service technician is dispatched on request. Call (321) 550-1192 or email nelson@neweratesting.com. Hours 7:00 am – 7:00 pm.

Switchgear lineup with protective relays and control devices

Request a Quote

Schedule testing, commissioning, or emergency field support.

Share your scope and schedule — a field service technician is dispatched on request. Call (321) 550-1192 or email nelson@neweratesting.com. Hours 7:00 am – 7:00 pm.

Switchgear lineup with protective relays and control devices

Request a Quote

Schedule testing, commissioning, or emergency field support.

Share your scope and schedule — a field service technician is dispatched on request. Call (321) 550-1192 or email nelson@neweratesting.com. Hours 7:00 am – 7:00 pm.

Switchgear lineup with protective relays and control devices

Create a free website with Framer, the website builder loved by startups, designers and agencies.