Commissioning & Troubleshooting
Commissioning & Acceptance Testing
ANSI/NETA ATS acceptance testing and end-to-end commissioning of electrical power and protection systems, verifying equipment, wiring, settings, and trip paths before first energization.
Scope
Acceptance · functional · system testing
Deliverable
Detailed technical commissioning documentation
Standards
ANSI/NETA ATS · IEC 61850
Service Overview
Every device and protection function proven before energization.
Acceptance testing proves each piece of equipment is undamaged, correctly installed, and within manufacturer tolerances. Commissioning proves the system works together. NewEra Testing delivers both: ANSI/NETA ATS testing of switchgear, transformers, and cable, followed by functional verification of protection and control schemes, including secondary injection, trip checks, IEC 61850 GOOSE validation, and VFD startup. Relay settings are applied and verified as issued by the engineer of record.
Equipment covered
Protective relays and relay panels
Medium- and low-voltage switchgear
Circuit breakers and disconnect switches
Power and distribution transformers
Instrument transformers (CTs and PTs)
Medium-voltage cable systems
IEC 61850 communication networks
Variable frequency drives and motors
Generator and motor protection schemes
Testing & Capabilities
From Component Acceptance to Full System Verification
Testing follows a deliberate sequence: individual equipment, then wiring and control schemes, then the integrated system. Each stage is verified and documented before energization.
Applicable Standards
Performed to recognized industry standards.
ANSI/NETA ATS
Acceptance Testing Specifications for Electrical Power Equipment and Systems
IEC 61850
Communication Networks and Systems for Power Utility Automation
IEEE 1588
Precision Clock Synchronization Protocol for Networked Measurement and Control Systems
IEC 60255
Measuring Relays and Protection Equipment
NFPA 70E
Standard for Electrical Safety in the Workplace
From the Field



Methodology
How every job runs.

Related Services
Related services

01
Protective Relay Testing & Commissioning
Field testing and commissioning of protective relays: settings applied and verified, protection functions proven by secondary injection, and trip paths confirmed end to end.
View service →

03
Secondary Injection Testing
Three-phase secondary injection testing of protective relays. Pickup, timing, and logic verified across overcurrent, differential, and distance elements, documented to ANSI/NETA test specifications.