Protection & Controls
Protective Relay Testing & Commissioning
Field testing and commissioning of protective relays: settings applied and verified, protection functions proven by secondary injection, and trip paths confirmed end to end.
Scope
Commissioning · maintenance · emergency validation
Deliverable
Verified relay performance · test reports
Standards
ANSI · NETA · IEEE · IEC
Service Overview
Every protection function verified before it’s called on.
Protective relays sit idle until the moment they matter. NewEra Testing proves they will operate as intended. Our field teams apply settings issued by the engineer of record or client, then verify each protection function by secondary injection: pickup, timing, slope, and reach. Trip outputs, CT and PT circuits, and breaker operation are confirmed end to end, with every test performed to ANSI, NETA, IEEE, and IEC standards.
Equipment covered
Multifunction microprocessor relays
Feeder and overcurrent relays
Transformer differential relays
Generator protection relays
Motor protection relays
Line distance relays
Electromechanical and solid-state relays
Lockout and auxiliary relays
Current and voltage transformers
Testing & Capabilities
Beyond standard protection function verification
Comprehensive three-phase testing across overcurrent, differential, and distance elements, plus the logic, instrument transformer circuits, and trip paths that make protection work in service.
Applicable Standards
Performed to recognized industry standards.
ANSI/NETA ATS
Acceptance Testing Specifications for Electrical Power Equipment and Systems
ANSI/NETA MTS
Maintenance Testing Specifications for Electrical Power Equipment and Systems
IEEE C37.2
Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations
IEC 60255
Measuring relays and protection equipment
NFPA 70E
Standard for Electrical Safety in the Workplace
From the Field



Methodology
How every job runs.

Related Services
Related services

03
Secondary Injection Testing
Three-phase secondary injection testing of protective relays. Pickup, timing, and logic verified across overcurrent, differential, and distance elements, documented to ANSI/NETA test specifications.
View service →

02
Protection & Control Systems
Field commissioning, inspection, and troubleshooting of complete protection and control systems: relay logic, IEC 61850 communications, time synchronization, and the schemes that tie them together.
View service →

08
Commissioning & Acceptance Testing
ANSI/NETA ATS acceptance testing and end-to-end commissioning of electrical power and protection systems, verifying equipment, wiring, settings, and trip paths before first energization.
View service →
FAQs